New Braunfels, Texas
Steel-and-concrete boathouses, docks, and bulkheads, engineered to endure for generations on the lakes of Central Texas.
What We Build
Every structure is framed in steel and decked in concrete, engineered for the conditions on each Guadalupe-system lake.
Single, double, and triple boathouses with integrated cradle lift systems.
Explore boathouses →
New dock construction, replacement, and full waterfront rebuilds.
Explore docks →
Personal watercraft lift and pivot systems integrated into the dock.
Explore PWC lifts →
Steel sheet pile bulkheads and limestone block walls for shoreline protection.
Explore shoreline work →
Fully insured waterfront construction on every project.

GBRA and county permit coordination handled in-house.

A deep track record across every Central Texas lake we serve.

Barge-equipped for full site access where land staging is tight.

Featured Project
[PLACEHOLDER — featured project narrative pending client confirmation. Draft built around a Lake Dunlap south-bank rebuild: shoreline stabilized first, then a double boathouse set on steel pilings driven to refusal.]
What Property Owners Say
They were meticulous, precise, and very respectful of the surrounding property. They cleaned up the place beautifully. You don't get contractors much like this anymore. They gave me updates every day.
Chad Johannesen with Waterfront Unlimited is professional, does what he says when he says he'll do it, and is good at communication. My project was completed in a timely manner and looks very nice. I would recommend them to anyone.
Their responsiveness, professionalism, and willingness to help on short notice saved our weekend. Great customer service, quality work, and a company that truly takes care of its customers. I highly recommend them.
Waterfront Unlimited did a fantastic job on my waterfront and deck. It looks beautiful, the work was professional, and the price was reasonable. They did so well I hired them again to build a boat lift. I would not hire anyone else.
What to Expect
We self-perform all structural, steel, and marine construction with our own crew, and we're on-site daily throughout every project.
Property owners have direct access to the project lead. Questions are answered promptly and clearly, not routed through layers of management.
Every project has a defined schedule with consistent daily presence from start to finish. No gaps, no guesswork about when work resumes.
We operate exclusively on Central Texas lakes. Our equipment, crew, and experience are concentrated here, not spread across distant regions.
Service Areas
Common Questions
[PLACEHOLDER FAQ — drafted from site content. Replace with GBP Optimizer FAQ output.]
Yes. Permit coordination is handled in-house as part of every project. A GBRA construction permit and a county permit are typically required for dock, boathouse, and bulkhead work, and applications are managed in parallel with construction planning.
Boathouse and dock frames are built with steel and decks are poured concrete. These materials outlast wood by decades and eliminate the maintenance cycles that come with wood construction.
Standalone dock projects typically run about 2 to 4 weeks. Full waterfront rebuilds that include shoreline work and a boathouse take longer, and every project is given a defined schedule up front.
Lake McQueeney, Lake Dunlap, Lake Seguin, Meadow Lake, Lake Placid, Canyon Lake, and the Guadalupe River system. The crew works these lakes regularly rather than traveling in from distant regions.
Start the Conversation
Whether you're planning a new structure or replacing an existing one, we welcome the conversation.