
Portfolio
Boathouses, docks, bulkheads, and full waterfront rebuilds on the Guadalupe River system.
Case Studies
A double boathouse, two 20x20 swim platforms, and 300+ feet of bulkhead, built on dry ground during the drawdown.
Read the case study →
A failing 1990s wood-post bulkhead and boathouse replaced with 120 ft of CLOC bulkhead, a double boathouse, a 34x29 ft upper patio, and a limestone retaining wall.
Read the case study →
An end-of-life waterfront near Solms Landing replaced in full: 200+ ft of CLOC vinyl bulkhead with a 4-ft concrete cap, a new double boathouse, dock, and water entry stairs.
Read the case study →
A new build on a raw shoreline: 16x40 concrete dock, 16x20 upper patio, custom steel-and-concrete ramp with 9-strand cable rails, water entry stairs, 70 ft of CLOC bulkhead, and a limestone retaining wall.
Read the case study →
Recent Work











Start the Conversation
Whether you're planning a new structure or replacing an existing one, we welcome the conversation.